MENU

to the main page

Bathroom renovation

We begin the repair of the bathroom with the dismantling of plumbing. Masters clean old furniture, plumbing, remove mirrors and other interior items that will interfere in the future or go to the trash. We close the pipes, put plugs on them. Further, if necessary: sometimes we remove only the tile, and sometimes it is necessary to get to the old screed layer by layer, remove it. If you do not need guests in the form of fungus or other filth, it is better to remove everything that has previously come into contact with water, contains cracks, depressions where damp zones could be created. In the bathroom, we continue to replace pipes and plumbing equipment. We proceed to the stage of rough finishing and wiring installation in compliance with safety standards. After removing the old tiles, tiles - the walls and floor most often become uneven. Then we are engaged in electrical wiring - an electrician will come to you. We do the wiring safely, with good cables. The next stage is the finishing of the room. Preparation of the floor, walls and ceiling for subsequent coating. Next, we make cladding for the walls or paint with a special waterproof paint. We install plumbing fixtures, switches, sockets, lamps, in general, we carry out all plumbing work.

contacts

leave your contact details or contact me in a way that is convenient for you

Name *
Phone number *

ADDRESSES

Tameem House Office Building - Barsha Heights - Dubai

Ask us questions